Making the shuttering for the vertical concrete pours.
-
Insulation in place, the radon barrier goes in front and the concrete in front of that.
-
-
I decided to take out the last part of the inspection chamber as it wasn't supporting anything.
-
-
George eyes up a pigeon.
-
The most recent excavation is between two retaining wall bases. Here you can see the insulation and DPM under the second base to be poured.
-
The view from above. The center of the picture is the most recent excavation.
-
Vertical steels in place.
-
-
-
-
Foamglas going into base 5.
-
Jimbo helping out with last minute work before an inspection.
-
-
Lowering the steels into base 5.
-
-
The concrete for base 5 and half of the four vertical sections for the first four retaining walls.
-