Progress During April 2010
-
-
-
-
-
-
My mum with sand for the back of the backing blocks for the last section of retaining wall.
-
The backing block wall for the last section of the basement going up.
-
Rear wall at the back of the building. Membrane coming through the wall.
-
-
-
-
Insulation in place.
-
-
-
Internal basement wall. This corner of the basement will be the back of the storage room.
-
-
Concrete sandwich
-
-
-
Rear wall going up.
-
-