Progress During April 2010

  • My mum with sand for the back of the backing blocks for the last section of retaining wall.
  • The backing block wall for the last section of the basement going up.
  • Rear wall at the back of the building. Membrane coming through the wall.
  • Insulation in place.
  • Internal basement wall. This corner of the basement will be the back of the storage room.
  • Concrete sandwich
  • Rear wall going up.