The larger of the two tree stumps. As it was uncovered it became clear just how big it was. Estimated to weigh just over a tonne.
-
To provide access for the chainsaw and there isnt space for a stump grinder the roots have to be unearthed. A very slow process.
-
-
Rope in an attempt to make it fall in a way which isn't on top of me.
-
Small bridge over the tree so I could still excavate with it in the way. Bit precarious.
-
-
Man with a bigger chainsaw
-
The blade needed to be sharpened every fourty minutes as stones grow into the bark and can't be seen until the chainsaw sparks.
-
Hot air balloons in the distance
-
Before the next excavations
-
Chris trying out the big persuader
-
Trees cut up enough to roll out of the way. They are no longer balanced just above the next excavation. Bit safer. They will be cut up when I have time.
-
The second excavation starts. It joins the first to give more space to swing the sledge and pick axe....
-
... but I also have a breaker now!
-
Jon having a go with the breaker
-
-
Firewood for freecycle
-
Firewood for freecycle
-
Anthony in action
-
-
-
Second skip full.
-
Digging up the pavement for the electricity connection
-
Electricity workmen help with the skip delivery which appears at the same time
-
-
Little bit close to the cars because of some miscommunication. I couldnt watch this.
-
Conduit for power cable under my wall.
-
-
How to splice a live mains cable to connect the spur for my supply.
-
Joining the new spur on wearing big rubber gloves!
-
First stage install leaves a supply head in the temporary supply cabinet
-
Third excavation starts
-
-
I fitted a decent consumer unit so that it can be used with the final supply too. Bit of an over kill for a tempoary supply. There is also an 80A isolator and single external socket. It is ready for the 3rd stage of the electicity install.
-
-
Third stage is for Western Power to fit the meter supplier by SWEB. This was then connected to my isolator switch.
-
Pavement filled in.
-
-
August was mainly spent digging out the two trees at the back; digging the first excavations and having the electricity supply connected.