Progress During August 2009
-
-
-
-
-
Mixing mortar
-
-
-
-
Join with a previously contructed retaining wall panel.
-
-
-
Retaining wall insulation goes in.
-
-
-
-
The membrane was hidden at the bottom. Now the insulation is all in place it can be rolled out.
-
-
-
-
-
-
Inner skin of blocks being built.
-
-
-
Jon vibrating (compacting) the concrete within the retaining walls.