Progress During August 2010

  • The door way to the bin and bike store at the front (pointy end) of the toblerhome.
  • Stonework on the Sydenham Road side taking shape.
  • Correction to the stairs down into the basement.
  • Really ugly bit of wall being removed by Mike. Most of the odd looking brickwork will stay as part of the building's history to show how it has been pieced together and repurposed over time but the concrete block between the brick and stone has to go.
  • Sand blinding for the last slab's insulation.
  • Stone for the lane side. This is the original stone we took out to make space for the windows.
  • Membrane for the bin and bike store slab.
  • The toblerhome's final slab is in place!
  • DPC, cavity tray and mains water conduit on the left side of the bin and bike store.
  • Brushing out stonework.
  • First window to reach lintel level.
  • These lucky helpers got to clean out the inspection chambre.
  • Finishing stones - the easiest way to remove a centimeter.