Progress During December 2008

  • December was a slow month as I was also busy with other things. The only building activity was assembling the stair case shuttering which took ages.
  • The seven concrete steps going from the ground floor down into the basement are part of the building's structure. In the bottom left of the picture you can see the temporary wooden staircase which goes down the last 5 steps. The final staircase will have wooden treads on both sections.