Progress During December 2009
-
Cantilever shuttering in place
-
-
View from the road gives a better perspective
-
-
This is the inside skin of the main Sydenham Road wall. You can see insulation and the orange membrane which tanks the basement. The DPC goes at this level.
-
The first of the front wall stone in place
-
Carlo teaching me how to point stonework. The red bricks on the right are the corner of the front door.