Progress During December 2009

  • Cantilever shuttering in place
  • View from the road gives a better perspective
  • This is the inside skin of the main Sydenham Road wall. You can see insulation and the orange membrane which tanks the basement. The DPC goes at this level.
  • The first of the front wall stone in place
  • Carlo teaching me how to point stonework. The red bricks on the right are the corner of the front door.