Progress During February 2010
-
The column between the window and front door.
-
Folding wedge in place.
-
-
Couple of soft wood (temporary) wedges to add lateral restraint to the wall.
-
Wedges hammered into place just before I relaxed the acrow props.
-
Doesn't look like much but the acrow props are loose meaning the load of the roof has been transfered to my wall via the folding wedges.
-
Wall from the roof trusses down to the basement.
-