Progress During February 2010

  • The column between the window and front door.
  • Folding wedge in place.
  • Couple of soft wood (temporary) wedges to add lateral restraint to the wall.
  • Wedges hammered into place just before I relaxed the acrow props.
  • Doesn't look like much but the acrow props are loose meaning the load of the roof has been transfered to my wall via the folding wedges.
  • Wall from the roof trusses down to the basement.