Progress During February 2011

  • Andy preparing for water proofing the patio.
  • Guides for the fall on the concrete slab that will go on top of the block and beam deck.
  • Very expensive drain with integrated trap that clamps onto the rubber sheet that will water proof the patio.
  • 60kg EPDM rubber sheet 'resting' to settle out the creases.
  • Slab guides back in place.
  • Andy's neatly cut stone for the decorative panels which face the neighbour's patio.
  • Slab in place and starting to cure. That was a very hard day.
  • The nice man from Travis Perkins saved us some back breaking labour by deliverying straight onto the patio.