Progress During January 2012

  • Last of the block work completes the patio wall. Slate template on top.
  • Basement being prepared for levelling.
  • Making drawers for the stairs into the basement. There is a drawer in each step to make maximum use of the space.
  • The solar collector arrives.
  • Basement stairs under construction.
  • Assembling the frame for the solar collector.
  • Sofits, fascias and gutters being put on by Matt and Vandy. At last a job done by actual professionals.
  • Matt putting the lead tile in place for the solar collectors pipes.