Progress-July08

  • The next excavation is where the stairs from the ground floor to basement will be placed.
  • The foamglas, radon barrier and reinforced concrete from the first panels.
  • Foamglas being laid.
  • Radon membrane and steel in place ready for the concrete pour.
  • Concrete in place.
  • This retaining wall is only half height. The first seven steps down are cast in concrete with the last step being on this retaining wall.