Progress During June 2009

  • Ellie glues the foamglas into place to form the retaining wall's heel.
  • A floor slab that was cast last year.
  • The conduit holding the underground drainage is filled with gravel. Slates on top as they wont compress and the foamglas insulation can be laid on top.
  • Sand blinding; three layers of foamglas
  • Back of the vertical boards is packed with sand.
  • Foamglas in place and ready for the damp proof membrane.