Progress During June 2009
-
Ellie glues the foamglas into place to form the retaining wall's heel.
-
-
-
-
-
A floor slab that was cast last year.
-
The conduit holding the underground drainage is filled with gravel. Slates on top as they wont compress and the foamglas insulation can be laid on top.
-
Sand blinding; three layers of foamglas
-
-
Back of the vertical boards is packed with sand.
-
-
Foamglas in place and ready for the damp proof membrane.
-