Progress During June 2012

  • Ground floor oak flooring goes in.
  • Elm details around the staircase.
  • The main kitchen units arrive.
  • Anna cutting thin Elm venee rs.
  • The handrail's ply structure.
  • We were broken into. They climbed onto the patio, smashed through part of the roof, that didnt work so they smashed through the toughened and laminated glass door. An unsucessful attempt was made to steal the boiler. The boiler was already plumbed in so this resulted in a massive gas leak. We were really lucky this wasnt ignited!
  • Dry riser.
  • Extra storage space for the wide cavity wall on the Sydenham Lane side.
  • Rohan making a template for the worktop.
  • Cubby holes and sill storage in place.
  • The worktop in place.