Wall at the rear (widest part) of the building. This will be the back of the bedrooms.
-
Orshi about to insulate the cavity.
-
To the right of the front door. Stone and block cavity wall.
-
Ellie pointing.
-
-
Orshi brick laying
-
-
-
-
Marcus at the top of the final column of earth/rock just prior to the start of the last dig.
-
-
-
-
-
View of the last excavation from above. You can see the profile of the adjacent retaining wall.
-
Radon membrane down, steel ready to go in.
-
The soil pipe is for the washing machine. Bit hard to tell at this stage but this corner of the basement will be the storage room.
-
Cement mixer for the concrete pour. This section of floor slab was site mixed.
-
-
-
-
-
-
Last floor slab in place!
-
-