Progress During March 2011

  • Jill pointing the boundary wall.
  • Mike cutting blocks.
  • The wall at 1.92m. The proposed height is 2.9m which is marked by the yellow string which you can just about see.
  • The door way onto the patio. The gable end is the last wall structural wall.
  • Patio wall from the inside.
  • It is spring. The bird boxes Anna made me for Christmas go up.
  • Patio door viewed from the ground floor.
  • Gable end wall on the patio.
  • Template for the staircase.
  • Tempory platforms about to come out so the ground floor can go in.
  • Finnjoist wooden i-beams going in.
  • Mike the welder starts on the staircase.
  • Strings to help with the positioning.
  • Ground floor going in.