-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Graham preparing for the new roof joist that will in turn allow us to remove part of the A-frame that he is next to.
-
-
Moving the post that holds the roof up. Just 15cm changed the feel of the landing on the stairs going from the ground to first floor.
-
The second Stokes Croft Riot. The toblerhome backs onto the squat at the centre of the trouble.
-
-
Wax oil sample onto an offcut of Elm.
-
Osmo Polyx Satin Oil.
-
-
-
-
-
Last two steps from the landing to the top floor.
-
-
-
-
Graham sitting on his creation.
-
-
-
Windows and doors
-
The gable end ready for the new capping beam.
-
The new capping beam.
-
-
-