Progress During November 2011

  • Finished rear wall.
  • Preparing for the last concrete pour in the basement. These are the inspection chamber and well.
  • Patio wall on the Sydenham Lane side.
  • Incorrect verg which needs to be re-done.
  • Idea for a railing.
  • Template for the Bath stone.