Main Photos Page
Progress During November 2011
Finished rear wall.
Preparing for the last concrete pour in the basement. These are the inspection chamber and well.
Patio wall on the Sydenham Lane side.
Incorrect verg which needs to be re-done.
Idea for a railing.
Template for the Bath stone.