  • Beam on old retaining wall's ledge. The area below has been rendered and the floor in place.
  • The floor is continuous with the steps down into the basement.
  • Monster concrete beam which was on the land I bought from the neighbours. It needs to be cut back to the boundry.
  • The is the widest part of the building. It has been dug down to street level and will be the back of the bedrooms. The ditch is for the concrete beam which will support the rear wall and patio.
  • Steel being tied for the rear beam.
  • Steel ready for concrete pour.
  • Concrete pour
  • Beam in place and shuttering removed.
  • The wall on the left is the edge of the basement. It will become the edge of this section of floor.
  • Anna cutting the floor to level and compacting the edge against the beam.