Progress During September 2008

  • Preparing to dig the stairwell
  • Spiral staircase dug out
  • Insulation and radon membrane for the retaining wall which encloses the stairs.
  • The wooden stairs are temporary. The final 6 steps into the basement will be made with a steel frame and wooden treads.
  • Strings mark the positions of each concrete step.