Progress During September 2008
-
-
Preparing to dig the stairwell
-
Spiral staircase dug out
-
-
-
Insulation and radon membrane for the retaining wall which encloses the stairs.
-
The wooden stairs are temporary. The final 6 steps into the basement will be made with a steel frame and wooden treads.
-
Strings mark the positions of each concrete step.