DSC03018-mid.JPG

Normally a sewer is laid in the uphill direction but as the exact (to within 20mm) position of the invert is required for the structure they would lay the sewer starting at my building. First they dug down to the point where I'd join the main sewer to ensure it was at the expected depth.